Question 245General Subjects - Assistant Engineer
70% to passThe line labeled "C", as shown in the illustration would be identified as the _______________. Illustration GS-0175

Aprocessed water outlet line
Bclean water inlet line
Coily bilge water inlet line
Dwaste oil discharge line
AI Explanation
The correct answer is B) clean water inlet line. The illustration GS-0175 likely depicts a schematic diagram of a marine oily water separator system, which is a common piece of equipment found on commercial vessels. The line labeled "C" would be the clean water inlet line, which carries the treated water from the separator back into the vessel's system for reuse or overboard discharge. The other answer choices are incorrect because: A) The processed water outlet line would not be labeled "C". C) The oily bilge water inlet line would typically be labeled with a different letter. D) The waste oil discharge line would also have a different label.
Related Questions
Q200:The hydraulic tubing installation shown as figure "D" is INCORRECT and will prob... Q117:Which of the following conditions can cause high salinity of the distillate due ... Q640:In machine shop practice, a center gage is used for checking the angle of ______... Q199:Both the direction of flow and fluid flow rate of a variable displacement radial... Q170:For which of the following reasons is a linear actuator fitted with a cushioning...
Ready to test your knowledge?
Take a General Subjects - Assistant Engineer Practice ExamOfficial Resources