Question 3869 Deck General
70% to passPeriodic surveys to renew the load line assignment for a MODU must be made at intervals not exceeding _______________.
A
18 months
B
2 years
C
3 years
D
5 years
AI Explanation
The correct answer is D) 5 years. Periodic surveys to renew the load line assignment for a Mobile Offshore Drilling Unit (MODU) must be made at intervals not exceeding 5 years, as per the requirements of the International Convention on Load Lines, 1966. This convention specifies that load line assignments for MODUs must be renewed through a full survey every 5 years to ensure the vessel's continued compliance with load line regulations. The other options are incorrect because 18 months, 2 years, and 3 years do not align with the 5-year renewal interval required for MODU load line assignments.
Related Questions
Q1980:A nylon line is rated at 15,000 lbs. breaking strain. Using a safety factor of 5...
Q188:While your vessel is docked port side to a wharf, a sudden gale force wind cause...
Q4596:A semisubmersible, with a TCG of 0.5 foot to port, displaces 20,000 long tons. ...
Q3286:The connected joints of pipe, usually made of three joints of pipe approximately...
Q916:Peck and Hale gear is used most commonly for securing _______________.
Ready to test your knowledge?
Take a Deck General Practice Exam