Question 3647 Deck General
70% to passA simplified construction plan may be included in the MODU construction portfolio provided it adequately defines the _______________.
A
type and strength of materials used
B
hazardous areas
C
location of emergency repair equipment
D
areas where special materials are used
AI Explanation
The correct answer is D) areas where special materials are used. A simplified construction plan for a MODU (Mobile Offshore Drilling Unit) should adequately define the areas where special materials are used. This is because the construction plan needs to provide information on the specific materials and their locations to ensure the integrity and safety of the MODU. The other options, such as the type and strength of materials used (A), hazardous areas (B), and the location of emergency repair equipment (C), while important, are not the primary focus of a simplified construction plan.
Related Questions
Q@q.QuestionNumber:The DEEP DRILLER, while loaded as shown in the Sample Load Form #5, discharges 1...
Q@q.QuestionNumber:What effect does lifting the shank of a Baldt Stockless anchor that is set on th...
Q@q.QuestionNumber:When tank cleaning with a portable machine, the weight of the machine is suspend...
Q@q.QuestionNumber:You are on a semisubmersible being towed and are concerned that a fishing vessel...
Q@q.QuestionNumber:You attach a line to a stationary barge lying off your starboard beam in order t...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App