Question 168Steam Plants - QMED

70% to pass

Prior to relieving the watch you should first check the fire room status by verifying the boiler steam drum level and _______________.

Aport and starboard settling tank levels
Bpreparing to blow tubes
Cinspecting the fires and burners
Dstack temperature
AI Explanation

The correct answer is C) inspecting the fires and burners. Before relieving the watch, it is crucial to check the status of the fire room, which includes verifying the boiler steam drum level and inspecting the fires and burners. This is a standard procedure for ensuring the safe and efficient operation of the boiler system. Checking the port and starboard settling tank levels (option A) or the stack temperature (option D) are not directly related to the immediate fire room status. Preparing to blow tubes (option B) is a separate maintenance task that is not part of the pre-watch relief check.

Ready to test your knowledge?

Take a Steam Plants - QMED Practice Exam

Want to practice with timed exams?

Download Coast Guard Exams for the full exam experience.

Get the App