Question 41Steam Plants - 1st Asst/Chief
70% to passWhen preparing to hydrostatically test water-tube boilers, you should _______________.
Aremove all inspection plates and manhole covers as required by the marine inspector
Bmake arrangements for simultaneously testing main and auxiliary steam stops with water and steam pressure
Chave the boiler warmed to a temperature not exceeding 100°F
DD
AI Explanation
The correct answer is A) remove all inspection plates and manhole covers as required by the marine inspector. When preparing to hydrostatically test water-tube boilers, you should remove all inspection plates and manhole covers as required by the marine inspector. This allows the inspector to thoroughly inspect the interior of the boiler and ensure its integrity before the hydrostatic test is conducted. The other answer choices are incorrect because: B) is not necessary for the hydrostatic test itself, but may be required during other inspections. C) is not relevant, as the boiler should be at ambient temperature for the hydrostatic test.
Related Questions
Q280:In a regenerative air heater, air is bypassed around the heater while __________... Q369:Allowance for axial expansion of the steam turbine due to temperature changes is... Q281:A variable capacity, pressure atomizing, fuel oil burner functions to __________... Q299:Oil supply pressure to the main lube oil header of a gravity feed lube oil syste... Q160:When operating under constant load, the superheated steam temperature may rise a...
Ready to test your knowledge?
Take a Steam Plants - 1st Asst/Chief Practice ExamOfficial Resources