Question 359Steam Plants - 1st Asst/Chief
70% to passWhile a vessel is underway the low-pressure turbine high-speed pinion is damaged. The pinion is then removed from the gear train. Under these circumstances, the main unit is capable of which speed and direction?
AReduced speed ahead only
BReduced speed astern only
CReduced speed ahead and full speed astern
DReduced speed astern and full speed ahead
AI Explanation
The correct answer is A) Reduced speed ahead only. When the low-pressure turbine high-speed pinion is damaged and removed from the gear train, the main unit is only capable of reduced speed ahead. This is because without the high-speed pinion, the gear train is no longer able to transmit the full power of the turbine to the propeller shaft, limiting the vessel's speed. However, the vessel can still move forward at a reduced speed, as the remaining components of the propulsion system are still functional. The other options, such as reduced speed astern or full speed in either direction, are not possible without the intact high-speed pinion.
Related Questions
Q@q.QuestionNumber:A leaky fuel oil heater relief valve could be indicated by an increase in the __... Q@q.QuestionNumber:Raising vacuum on a main turbine unit without using the turning gear will result... Q@q.QuestionNumber:To minimize metal corrosion, boiler water is best kept _______________. Q@q.QuestionNumber:Desuperheated steam can be found at the _______________. Q@q.QuestionNumber:Which of the following actions should be carried out if the boiler water level i...
Ready to test your knowledge?
Take a Steam Plants - 1st Asst/Chief Practice ExamOfficial Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience.
Get the App