Question 2247 Deck Safety
70% to passA tanker loads at a terminal within the tropical zone. She will enter the summer zone five days after departing the loading port. She will burn off about 45 tons/day and daily water consumption is 8 tons. How many tons may she load over that allowed by her summer load line?
A
225
B
235
C
245
D
265
AI Explanation
The correct answer is D) 265 tons. The reasoning is as follows: 1) The tanker will be in the tropical zone for 5 days, consuming 45 tons/day and 8 tons/day for water, totaling 53 tons per day. 2) Over the 5 days in the tropical zone, the total consumption would be 53 tons/day x 5 days = 265 tons. 3) This amount of 265 tons is the additional weight the tanker can load over its summer load line before entering the summer zone. The other options are incorrect because they do not accurately calculate the total consumption over the 5-day period in the tropical zone.
Related Questions
Q911:With an approved combination nozzle, low-velocity fog is produced by ___________...
Q2414:You have 38 containers of ships stores each measuring 6'L by 6'B by 5'H and weig...
Q1877:The floors in a vessel's hull structure are kept from tripping, or folding over,...
Q1982:A welded joint's effectiveness is considered _______________.
Q460:Your voyage planning indicates you will arrive at a waypoint in longitude 049°16...
Ready to test your knowledge?
Take a Deck Safety Practice ExamOfficial Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app