Question 542 Deck General
70% to passThe signal man assisting the crane operator has his arm extended downwards, forefinger pointing down, and moves his hand in small horizontal circles. This is the signal to _______________.
A
swing
B
lower
C
hoist
D
extend
AI Explanation
The correct answer is B) lower. The signal of an extended arm with the forefinger pointing down and making small horizontal circles indicates that the crane operator should lower the load. This hand signal is part of the standard signaling system used in crane operations to communicate between the crane operator and the signal person, as specified in regulations and industry standards for crane safety. The other answer choices are incorrect because they do not match the described hand signal. Swinging (A), hoisting (C), and extending (D) the load would each have different corresponding hand signals.
Related Questions
Q4365:The DEEP DRILLER, at 58.0 feet draft in sea water, loads 200 long tons. What is ...
Q3019:Which type of carrier accepts without discrimination all legal cargoes of a ship...
Q5099:The DEEP DRILLER is loaded as shown in the Sample Load Form #5 (Survival) when a...
Q507:What does item "E" refer to in illustration D045DG of a 30-ton pedestal crane? ...
Q2305:Which of the following best describes the requirement of the emergency pump cont...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app