Question 5095 Deck General

70% to pass

While drilling loaded as shown in Sample Load Form Number 4 (Drilling), the DEEP DRILLER suffers an unexpected but slowly increasing port and aft inclination. The wind and waves are light. This inclination could have been caused by _______________.

A ballast tanks equalizing into tank 10P
B the drilling crew dumping the mud
C the drill string breaking
D the failure of mooring lines 2 and 3
AI Explanation

The correct answer is A) ballast tanks equalizing into tank 10P. When a vessel like the DEEP DRILLER is drilling, the inclination can be affected by the ballast tanks. If the ballast tanks are not properly maintained or monitored, they can experience an imbalance, leading to a slow but increasing port and aft inclination, as described in the scenario. This is the most likely cause of the issue, as it is a common challenge in offshore drilling operations. The other options are less likely to be the cause. The drilling crew would not intentionally dump the mud (B), the drill string breaking (C) would likely cause a more sudden and severe inclination, and the failure of mooring lines (D) would not necessarily result in the slow, increasing inclination described.

Ready to test your knowledge?

Take a Deck General Practice Exam

Want to practice with timed exams?

Download Coast Guard Exams for the full exam experience with progress tracking.

Get the App