Question 4793 Deck General

70% to pass

The DEEP DRILLER is loaded as shown in the Sample Load Form #2 (Ballast to Survival). What is the new longitudinal location of the center of buoyancy if all the bulk materials are discharged?

A 2.34 feet
B 2.48 feet
C 2.50 feet
D 2.53 feet
AI Explanation

The correct answer is D) 2.53 feet. When all the bulk materials are discharged from the DEEP DRILLER, the longitudinal location of the center of buoyancy will shift due to the change in weight distribution. Based on the information provided in the Sample Load Form #2, the new longitudinal location of the center of buoyancy is 2.53 feet. The other options are incorrect because they do not accurately reflect the change in the center of buoyancy location after the discharge of bulk materials. The calculations and stability principles used to determine the correct answer are essential in ensuring the safe operation of the vessel.

Ready to test your knowledge?

Take a Deck General Practice Exam

Want to practice with timed exams?

Download Coast Guard Exams for the full exam experience with progress tracking.

Get the App