70% to passThe DEEP DRILLER is loaded as shown in Sample Load Form #4 (Drilling). If port valves 24 and 2 are mistakenly opened, the change in inclination will be increasing trim by the _______________.
A
stern
B
bow
C
stern with starboard list
D
bow with port list
AI Explanation
The correct answer is D) bow with port list. When port valves 24 and 2 are mistakenly opened on the DEEP DRILLER, it will cause an increase in the vessel's inclination, resulting in a change in trim by the bow with a port list. This is because the open valves will allow water to enter the port side of the vessel, causing it to list to port and the bow to trim down. The other options are incorrect because: A) opening the valves would not increase trim by the stern, B) it would not increase trim by the bow, and C) it would not increase trim by the stern with a starboard list.
Related Questions
Q2858:Firefighting equipment requirements for a particular vessel may be found on the ...
Q1531:Which of the following choices does not depict the tank inerting process on a ta...
Q4312:While elevated as shown in Sample Load Form #3 (Drilling), winds are 57 knots an...
Q1552:What is the primary function of a flame screen on a tank vessel?
Q1629:If your passenger vessel has been issued a stability letter, it must be _______...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app