Question 4747 Deck General
70% to passA virtual rise in the center of gravity of a MODU may be caused by _______________.
A
transferring pipe from the setback area to the pipe rack
B
filling a partially filled tank
C
emptying a partially filled tank
D
using an on board crane to lift a freely swinging heavy object
AI Explanation
The correct answer is D) using an on board crane to lift a freely swinging heavy object. The reason this is correct is that when a heavy object is lifted by a crane, the object's center of gravity rises, which in turn raises the overall center of gravity of the Mobile Offshore Drilling Unit (MODU). This change in the center of gravity can affect the MODU's stability and must be accounted for during operations. The other options are incorrect because transferring pipe (A) or filling/emptying a tank (B, C) would not directly affect the center of gravity in the same way as lifting a heavy object with a crane (D).
Related Questions
Q4078:When the anchor is brought to and holding, the horizontal component of anchor c...
Q812:A vessel constructed after 1970, carrying grades A, B, C or D cargoes, has enclo...
Q500:Using the available references, if the dry bulb temperature is 76° and the wet b...
Q4063:When inspecting ground tackle, fractures are most frequently found in the _____...
Q1460:You start a centrifugal cargo pump to discharge cargo. The pump works fine for a...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app