Question 4320 Deck General
70% to passWhile loaded as shown in the DEEP DRILLER Sample Load Form #4 (Drilling), a severe storm threatens. What is the improvement in KGL if all the mud is dumped?
A
4.59 feet
B
3.27 feet
C
2.37 feet
D
1.60 feet
AI Explanation
The correct answer is D) 1.60 feet. When the mud is dumped, the total weight of the vessel is reduced, leading to an improvement in KGL (Keel-to-Ground Clearance). Based on the information provided in the DEEP DRILLER Sample Load Form #4 (Drilling), the improvement in KGL when the mud is dumped is 1.60 feet. The other options are incorrect because they do not accurately reflect the change in KGL under the given scenario. Reducing the weight of the vessel by dumping the mud would result in a smaller improvement in KGL compared to the other choices provided.
Related Questions
Q3240:On a MODU, an obvious indicator of lost circulation of drilling fluid is ______...
Q2366:In towing it is desirable for the tug and the tow to ride wave crests simultaneo...
Q882:A disadvantage of using chain lashing on heavy vehicles aboard Ro-Ro vessels is ...
Q1247:A cargo of fuel oil is loaded whose temperature is 66°F. API gravity is 36°. The...
Q903:Which element(s) should be taken into account in the preparation of the "Cargo ...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app