70% to passWhen elevating the COASTAL DRILLER in 200 feet of water, the unit should be placed at an air gap of _______________.
A
35 feet
B
32 feet
C
30 feet
D
25 feet
AI Explanation
The correct answer is C) 30 feet. When elevating a COASTAL DRILLER in 200 feet of water, the unit should be placed at an air gap of 30 feet. This is in accordance with the regulations set forth by the US Coast Guard for the safe operation of offshore drilling units. The air gap ensures that there is sufficient clearance between the top of the unit and the water's surface, providing a safety buffer in case of unforeseen events or wave action. The other options, while potentially reasonable in some scenarios, do not align with the specific requirements for a COASTAL DRILLER in 200 feet of water.
Related Questions
Q3885:A wedge of water building up between the bow and nearer bank which forces the b...
Q2468:Which type of bridle is the most effective for a heavy ocean tow?
Q4110:How does the effect known as "bank suction" act on a single-screw vessel proceed...
Q5054:What pump may be used to supplement the bilge pump on the DEEP DRILLER?
Q642:What is the maximum weight the 30 ton capacity pedestal cranes shown in illustra...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app