Question 3672 Deck General
70% to passAfter cranes have been installed on offshore drilling units the hooks, hook block, slings, rib and other rigging must be load tested. This test must be performed once each _______________.
A
12 months
B
24 months
C
36 months
D
48 months
AI Explanation
The correct answer is D) 48 months. The reason for this is that according to the regulations set by the U.S. Coast Guard, offshore drilling units must have their cranes, hooks, hook blocks, slings, and other rigging equipment load tested once every 48 months (4 years). This requirement is in place to ensure the safe operation and continued functionality of this critical equipment over time. The other answer choices, such as 12 months, 24 months, and 36 months, are incorrect because they do not align with the Coast Guard's regulatory requirements for the frequency of these load tests on offshore drilling units.
Related Questions
Q1664:Each OSV must carry _______________.
Q2155:The correct way to make an eye in a wire rope with clips is to place the clips w...
Q4722:The maximum draft to which a drilling unit may be safely loaded is called _____...
Q1070:What must be present in order for combustion to occur inside a piping system suc...
Q3868:A load line is assigned to a MODU to insure adequate stability and ____________...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app