Question 3640 Deck General
70% to passA What repair or modification to a MODU would most likely require consulting the construction portfolio?
The correct answer is A) Replacing a service pump foundation. Replacing a service pump foundation would most likely require consulting the construction portfolio because the pump foundation is a structural component of the MODU (Mobile Offshore Drilling Unit) that was designed and installed during the initial construction. Any modifications to the structural integrity of the MODU would need to be reviewed against the original construction plans and specifications to ensure the changes do not compromise the overall safety and stability of the unit. The other options, such as replacing watertight doors in quarters (B), repairing drill pipe racks on deck (C), or repairing the leg-to-can connection on a jack-up (D), while still potentially requiring review, are more likely to be considered routine maintenance or repairs that would not necessarily require consulting the full construction portfolio.
Ready to test your knowledge?
Take a Deck General Practice ExamWant to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App