Question 355 Deck General

70% to pass

Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom?

A Spider band
B Topping lift
C Cargo whip
D Gooseneck fitting
AI Explanation

The correct answer is B) Topping lift. The topping lift is responsible for the vertical control and positioning of a cargo boom. It is a line that runs from the top of the boom to a fixed point, allowing the operator to raise or lower the boom as needed during cargo operations. This controlled movement is critical for safely positioning the boom and the cargo being handled. The other options are incorrect because: - A) Spider band - This refers to the arrangement of ropes that support the boom, not the mechanism for vertical positioning. - C) Cargo whip - This is a separate line used for hoisting and lowering cargo, not for boom positioning. - D) Gooseneck fitting - This is the connection point between the boom and the ship's structure, not the control mechanism.

Ready to test your knowledge?

Take a Deck General Practice Exam

Want to practice with timed exams?

Download Coast Guard Exams for the full exam experience with progress tracking.

Get the App