Question 3489 Deck General
70% to passUsing high working tensions in the mooring system reduces the _______________.
A
hook load at drilling depths over 10,000 feet
B
allowable deck load at operating draft
C
margin between working tension and breaking strength
D
possibility of dragging anchors
AI Explanation
The correct answer is C) margin between working tension and breaking strength. Using high working tensions in the mooring system reduces the margin between the working tension and the breaking strength of the mooring lines. This decreases the safety factor and increases the risk of the mooring system failing under high loads. The other answer choices are incorrect because they do not directly relate to the effect of high working tensions on the mooring system.
Related Questions
Q90:The old sailors admonition "Beware the lee shore" warns of the danger due to __...
Q1805:In the regulations that apply to small passenger vessels an "open boat" is a ves...
Q323:Using the available references, if the dry bulb temperature is 68°and the wet bu...
Q2685:The control panel of a fire detection system must have all of the following EXC...
Q3584:Certificates of Inspection for offshore drilling units are issued for a period o...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app