Question 3387 Deck General
70% to passIn anticipation of heavy weather, it is decided to deballast the DEEP DRILLER to survival draft. The marine riser should be disconnected, pulled, and laid down. After doing so, the riser tension will be _______________.
A
equal to the weight of the riser
B
applied at the riser tensioner sheaves
C
zero
D
dependent on the water depth
AI Explanation
The correct answer is C) zero. When the marine riser is disconnected and laid down, the tension on the riser will be zero. This is because the weight of the riser is no longer being supported by the riser tensioner system. Without the riser connected, there is no longer any tension or load being applied to the riser. The other options are incorrect because: A) the weight of the riser is not being supported, so the tension is not equal to the riser weight; B) the riser tensioner sheaves are not in use since the riser is disconnected; and D) the water depth is not a factor once the riser is disconnected and laid down.
Related Questions
Q@q.QuestionNumber:Your vessel is being towed and back-up wires have been installed. Back-up wires ...
Q@q.QuestionNumber:The DEEP DRILLER, while loaded as shown in the Sample Load Form #4 (Drilling), s...
Q@q.QuestionNumber:When bunkering is complete, the hoses should be _______________.
Q@q.QuestionNumber:Under U.S. law, what is the penalty for assaulting the Master?
Q@q.QuestionNumber:Which describes a sailing vessel with the wind coming from 290° relative?
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App