Question 3377 Deck General

70% to pass

The initial tension set in the mooring system of a MODU establishes the _______________.

A maximum time it will take to disconnect the riser package in the event of a storm
B minimum amount of ballast needed to keep the vessel at operating draft during normal drilling operations
C distance the unit can be offset from the wellbore before the restoring forces oppose the environmental forces
D maximum water depth at which drilling operations can be conducted
AI Explanation

The correct answer is C) the distance the unit can be offset from the wellbore before the restoring forces oppose the environmental forces. The initial tension set in the mooring system of a Mobile Offshore Drilling Unit (MODU) establishes the maximum allowable offset distance from the wellbore. This is because the mooring lines provide restoring forces that counteract the environmental forces (e.g., wind, waves, currents) acting on the MODU. The initial tension ensures that the MODU can maintain its position over the wellbore within acceptable limits during normal drilling operations. The other answer choices are incorrect because they do not directly relate to the function of the initial mooring tension. Option A is about storm disconnection, option B is about ballast requirements, and option D is about water depth limitations, which are not the primary purpose of the initial mooring tension.

Ready to test your knowledge?

Take a Deck General Practice Exam

Want to practice with timed exams?

Download Coast Guard Exams for the full exam experience with progress tracking.

Get the App