Question 3198 Deck General
70% to passThe objective of shoring the damaged area of a MODU is to _______________.
A
force the warped, bulged, or deformed sections back into place
B
withstand subsequent additional damage
C
make a watertight seal at the damaged area
D
support and hold the area in the damaged position
AI Explanation
The correct answer is D) support and hold the area in the damaged position. The objective of shoring the damaged area of a MODU (Mobile Offshore Drilling Unit) is to support and hold the damaged section in place. Shoring is used to stabilize and reinforce the structure, preventing further deformation or collapse. It is not intended to force the damaged sections back into place (A), withstand additional damage (B), or create a watertight seal (C). The primary goal is to maintain the structural integrity of the MODU by securing the damaged area until repairs can be made.
Related Questions
Q@q.QuestionNumber:A heavy, thick-walled tube, usually steel, used between the drill pipe and the b...
Q@q.QuestionNumber:According to U.S. regulations, what vessels are required to have the "Discharge ...
Q@q.QuestionNumber:If a drill required by regulations is not completed on a mobile offshore drillin...
Q@q.QuestionNumber:The element that supports the weight of the drill stem, allows the drill stem to...
Q@q.QuestionNumber:On some sail boats, the bottom of the mast rests on a part of the keel. What is ...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App