Question 3198 Deck General
70% to passThe objective of shoring the damaged area of a MODU is to _______________.
A
force the warped, bulged, or deformed sections back into place
B
withstand subsequent additional damage
C
make a watertight seal at the damaged area
D
support and hold the area in the damaged position
AI Explanation
The correct answer is D) support and hold the area in the damaged position. The objective of shoring the damaged area of a MODU (Mobile Offshore Drilling Unit) is to support and hold the damaged section in place. Shoring is used to stabilize and reinforce the structure, preventing further deformation or collapse. It is not intended to force the damaged sections back into place (A), withstand additional damage (B), or create a watertight seal (C). The primary goal is to maintain the structural integrity of the MODU by securing the damaged area until repairs can be made.
Related Questions
Q4644:What is the shift in KG if all the liquid mud is dumped when the DEEP DRILLER is...
Q2663:An uninspected 6,000 BHP, 199 GT tug operating on the Great Lakes is required to...
Q4477:For the DEEP DRILLER, in deballasting to survival draft when threatened with hea...
Q2610:Before operating a non-oceangoing ship greater than 100 gross tons it must have ...
Q4325:The lightweight longitudinal moments for the DEEP DRILLER are _______________.
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app