Question 152 Deck General
70% to passA vessel is loaded to her summer marks for a voyage from Montreal, Canada to Duluth, MN via the Great Lakes System. The voyage has been estimated to take nine (9
A
A
B
B
C
C
D
D
AI Explanation
The correct answer is T. The voyages through the Great Lakes System are governed by the Great Lakes Load Line Convention, which requires vessels to be loaded to their summer load lines. Since the vessel is loaded to her summer marks for the voyage from Montreal to Duluth, the answer is T, indicating that the vessel is properly loaded for the voyage. The other answer choices (A, B, C, D) do not correctly reflect the requirements for a voyage through the Great Lakes System, as they do not specify that the vessel is loaded to the appropriate summer load line.
Related Questions
Q@q.QuestionNumber:The primary purpose of the stud is to prevent the anchor chain from ___________...
Q@q.QuestionNumber:What is NOT required of the cargo tank venting on a tank barge carrying grade A ...
Q@q.QuestionNumber:A list signal of one white light indicates that the vessel is _______________.
Q@q.QuestionNumber:What is the percentage of oxygen in a typical sample of uncontaminated air? ...
Q@q.QuestionNumber:While drilling loaded as shown in Sample Load Form Number 4 (Drilling), the DEEP...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App