Question 1352 Deck General
70% to passWhat device will be activated while loading a LNG tank and the HI-HI liquid level set point is reached?
A
No shutdown required.
B
Overflow shutdown.
C
Remote shutdown valve control.
D
Emergency shutdown.
AI Explanation
The correct answer is D) Emergency shutdown. When the HI-HI liquid level set point is reached while loading an LNG (Liquefied Natural Gas) tank, an emergency shutdown (ESD) system will be activated. This is a critical safety feature required by regulations to prevent an overflow and potential hazardous situation. The ESD system will automatically shut down the loading process and close the appropriate valves to isolate the tank and stop the flow of LNG. The other options are incorrect because they do not adequately address the critical safety requirement to initiate an emergency shutdown in this scenario.
Related Questions
Q3001:The Certificate of Inspection on a passenger vessel of over 100 gross tons must ...
Q1584:On tankers with manually operated tank valves, which of the following is the typ...
Q4762:The DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers maj...
Q79:Which is TRUE for a sailing vessel with the wind coming from 020° relative? ...
Q190:You are on watch and the pilot has just anchored the vessel. The next thing that...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app