Question 1326 Deck General
70% to passThe last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted _______________.
A
yellow/red/yellow
B
hi-visibility yellow
C
international orange
D
red/yellow/red
AI Explanation
The correct answer is D) red/yellow/red. The last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted in the international color scheme of red/yellow/red. This color scheme is specified in the regulations to provide a clear visual indication of the hazardous nature of the vapor piping. The other answer choices, while potentially used for other purposes, do not meet the specific regulatory requirement for the color scheme of this critical section of the vapor piping.
Related Questions
Q1299:Each hose used for transferring vapors must _______________.
Q1418:What can be used to prevent a flammable atmosphere from occurring in a tank cont...
Q844:The International Maritime Dangerous Goods Code assigns classes for dangerous go...
Q236:While the Pilot is maneuvering the vessel to a dock, what is the PRIMARY respon...
Q75:Which BEST describes the term "reaching"?
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app