Question 1326 Deck General
70% to passThe last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted _______________.
A
yellow/red/yellow
B
hi-visibility yellow
C
international orange
D
red/yellow/red
AI Explanation
The correct answer is D) red/yellow/red. The last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted in the international color scheme of red/yellow/red. This color scheme is specified in the regulations to provide a clear visual indication of the hazardous nature of the vapor piping. The other answer choices, while potentially used for other purposes, do not meet the specific regulatory requirement for the color scheme of this critical section of the vapor piping.
Related Questions
Q@q.QuestionNumber:Among the valves to open when deballasting using tanks 1P and 10P of the DEEP D...
Q@q.QuestionNumber:To develop maximum anchor holding power, the optimum angle between the anchor's...
Q@q.QuestionNumber:Among the valves that must be opened on the DEEP DRILLER to pump bilge water ou...
Q@q.QuestionNumber:Which of the following statement(s) is/are TRUE regarding twin pedestal cranes? ...
Q@q.QuestionNumber:The DEEP DRILLER, at 60.0 feet draft in sea water, has VM = 974,441 foot-long to...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App