Question 1326 Deck General
70% to passThe last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted _______________.
A
yellow/red/yellow
B
hi-visibility yellow
C
international orange
D
red/yellow/red
AI Explanation
The correct answer is D) red/yellow/red. The last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted in the international color scheme of red/yellow/red. This color scheme is specified in the regulations to provide a clear visual indication of the hazardous nature of the vapor piping. The other answer choices, while potentially used for other purposes, do not meet the specific regulatory requirement for the color scheme of this critical section of the vapor piping.
Related Questions
Q3532:Before personnel are lifted from a vessel in a personnel basket, the vessel shou...
Q4837:The DEEP DRILLER is loaded as shown in the Sample Load form #3 (Preparing to Dri...
Q2580:Regardless of local requirements, when in a U.S. port, all oil spills must be re...
Q697:Which spaces are required to be segregated from cargo tanks carrying grades A, B...
Q2713:After 1 September 1992, in the North Pacific area, a documented 75-foot fishing ...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app