Question 1243 Deck General
70% to passEvery U.S. crude oil tankship with a keel laying date on or after 1/1/75, shall be equipped with an inert gas system if the tonnage is more than _______________.
A
100,000 DWT (metric tons)
B
50,000 DWT (metric tons)
C
50,000 DWT (long tons)
D
100,000 DWT (long tons)
AI Explanation
The correct answer is A) 100,000 DWT (metric tons). This is based on the regulation in 46 CFR 32.53-1, which states that every U.S. crude oil tankship with a keel laying date on or after January 1, 1975, shall be equipped with an inert gas system if the tonnage is more than 100,000 DWT (deadweight tons) in metric tons. The other options are incorrect because 50,000 DWT is below the regulatory threshold, and DWT is measured in metric tons, not long tons.
Related Questions
Q1602:When a line is laid down in loose, looping figure-eights, it is said to be ____...
Q1995:Which knot in illustration D030DG below represents a stopper hitch?
Q4082:When anchoring, good practice requires 5 to 7 fathoms of chain for each fathom o...
Q1895:Which of these approved lifesaving devices must a small passenger vessel carryin...
Q2456:The term "bollard pull" refers to a towing vessel's _______________.
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app