Question 1018 Deck General
70% to passThe liquid-filled PV breaker has acted to relieve a vacuum in a tank. What action must be taken in regards to the PV-breaker before continuing operations?
A
Refill the breaker with liquid.
B
Install a new rupture disc.
C
Check to make certain that it has reset itself.
D
Manually reset the vacuum side of the breaker.
AI Explanation
The correct answer is A) Refill the breaker with liquid. The liquid-filled PV (pressure-vacuum) breaker is designed to relieve a vacuum in a tank by allowing air to enter the tank. If the liquid in the breaker has acted to relieve the vacuum, this means the liquid level has been depleted. Before continuing operations, the breaker must be refilled with the appropriate liquid to restore its functionality and ensure it can properly respond to future vacuum conditions in the tank. The other options are incorrect because they do not address the need to refill the depleted liquid in the breaker.
Related Questions
Q@q.QuestionNumber:Using the available references, if the dry bulb temperature is 55°F (13°C) and t...
Q@q.QuestionNumber:What is the advantage of a single streamlined fluke anchor over a double fluked ...
Q@q.QuestionNumber:Any firefighting equipment that is carried in addition to the minimum required n...
Q@q.QuestionNumber:According to small passenger vessel regulations, while serving as Master on boar...
Q@q.QuestionNumber:A claim for cargo damages may be held against the ship owner if such damage is t...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App